Rapid ROI on Capillary Bunkers for Landings Club

Last year, the six-course Landings Club, in Savannah, Georgia, installed the Capillary Bunkers liner on its Magnolia course, as part of a large-scale renovation with Arnold Palmer Design architect Brandon Johnson. And director of ground and projects Chris Steigelman says the results are already showing the wisdom of that decision.

Arnold Palmer Design architect Brandon Johnson

“We have dabbled with various bunker drainage techniques across our courses, though none of them apart from Magnolia have to wall to wall liners,” he says. “But part of the goals of the renovation project was to reduce our bunker maintenance workload. Brandon’s designs called for the bunker surface area to be reduced by 50 percent, and with the Capillary Bunkers liner, the amount of time we now spend on bunker sand maintenance has gone down dramatically.”

The new-look Magnolia has retained the steeply flashed bunker faces that the course previously had, and Steigelman says that the liner has played an important role in making the design work effectively. “We get around fifty inches of rain a year, and in the summertime, we often get thunderstorms coming from out of nowhere and dumping a huge load of rain on us,” he explains. “Previously, every time we got a big rain, the bunkers were destroyed, and I had to put several guys on rebuilding them for several days. Now, that doesn’t happen.”

The club started the renovation project in March 2021, with the Capillary Bunkers installation starting in June. The bunkers were finished in August, and the course reopened – hosting a Korn Ferry Tour event in its first week – at the start of November. Georgia-based contractor Todd Godwin Construction handled the work. 

Chris Steigelman Director of Ground & Projects Landings Club, GA

Steigelman says the benefits of the Capillary Bunkers technology have already been made very clear. “We operate two golf courses out of the Magnolia maintenance facility, the Marshwood course as well as Magnolia,” he says. “We got hit by two tropical storms, one on a Sunday night at the end of June: seven inches of rain, four in an hour and a half. It trashed the bunkers on Marshwood, to the extent that we had to spend $25,000 dollars on new bunker sand. The bunkers on Magnolia were like nothing had ever happened. It was incredible. I took our board out there and said to them ‘This is what you’re paying for.”

“I’m very grateful that we chose Capillary Bunkers, because of the ease of installation. During the build, it was raining every day, and so we wouldn’t have been able to install some of the competitor products. But the guys were just out there laying the concrete and then putting plastic sheeting over it to help it dry!”

About Capillary Bunkers

At the core of our solution, Capillary Bunkers is a patented and engineered polymer-based concrete. It is the only building material that can rapidly drain water while also moving water up. Capillary Bunkers’ cutting-edge, patented technology helps you control water in any climate, season, and soil type, providing better, more consistent playing experiences while reducing costs. http://www.capillaryconcrete.com

Capillary Bunkers is recognized as the world’s leading and most advanced bunker liner, and the most durable bunker construction method. It allows water to flow through the base of the bunker while keeping sand on the faces and preventing washouts, keeping bunkers in perfect shape during any weather condition. Over 800 courses around the world have built or renovated their

Golf Course Trades

Recent Posts

GCSAA announces winners of 2026 Legacy Awards

The Golf Course Superintendents Association of America (GCSAA) has awarded 20 college scholarships as part…

5 days ago

SiteOne Announces 28th Annual Women in the Green Industry Conference in New Orleans

Registration is now open for the 2026 Women in the Green Industry Conference hosted by…

5 days ago

Superintendents Online Turf Directory – EVERYTHING TURF

Our online directory, directory.GolfCourseTrades.com is the go-to resource for the busy superintendent. It is your opportunity…

6 days ago

$38 Million Renovation Planned for Virginia Beach National Golf Club

$38 Million Renovation Planned for Virginia Beach National Golf Club Virginia Beach National Golf Club…

1 week ago

The Irrigation System Behind One of Golf’s Most Iconic Courses

Maintaining one of the world's most iconic golf courses requires more than expert agronomy. At…

1 week ago

How One Golf Course Improved Turf Without Using More Water

As golf facilities across North America confront increasingly dry conditions and growing pressure to conserve…

2 weeks ago