Construction of the water tank on hole #2 is substantially completed. Work that remains is connecting it to the water source (non-potable University Lake Water) and installing the electrical service for the pump station. The water service connection will impact Fremont Rd. and the red tees on #2 in the next two weeks. The timetable for the electrical connection is unknown, and dependent on PG&E. Our hope is that everything will be completed by mid-November.
This water tank is required to remove the Siebel Varsity Golf Training Complex (SVGTC) from the golf course’s irrigation system. The course’s irrigation system was never designed with enough capacity to handle an additional 30 acres of irrigated turfgrass. It is an extremely complicated juggling act to irrigate both properties in the current configuration. When it gets hot, daytime watering must be done which hampers golf players and is inefficient due to wind and evaporation. The tank will allow us to take water during the daytime hours from the Lake Water pipeline (at a low time of use.) We will then fill the tank during the day, and pump from it at night on a completely separate system from the golf course. Since the SVGTC is built on a six-inch sand cap soil material, this will allow us to irrigate lighter and more frequently, reducing the loss of water out of the bottom of the rootzone.
https://www.youtube.com/watch?v=0odNj73xdtM&feature=youtu.be An award-winning golf club near London has won plaudits from bee and butterfly experts…
Inside NMP Golf Construction’s race to rebuild Detroit Golf Club on a PGA TOUR deadline…
More than three decades after Mike Strantz burst onto the golf course architecture scene with…
Find trusted suppliers, products and services for every area of your golf course—all in one…
Chad Braun, the equipment director at Town & Country Club in St. Paul, Minn., is…
This column features recollections of the author’s 38 years as a golf writer. These installments…