Construction of the water tank on hole #2 is substantially completed. Work that remains is connecting it to the water source (non-potable University Lake Water) and installing the electrical service for the pump station. The water service connection will impact Fremont Rd. and the red tees on #2 in the next two weeks. The timetable for the electrical connection is unknown, and dependent on PG&E. Our hope is that everything will be completed by mid-November.
This water tank is required to remove the Siebel Varsity Golf Training Complex (SVGTC) from the golf course’s irrigation system. The course’s irrigation system was never designed with enough capacity to handle an additional 30 acres of irrigated turfgrass. It is an extremely complicated juggling act to irrigate both properties in the current configuration. When it gets hot, daytime watering must be done which hampers golf players and is inefficient due to wind and evaporation. The tank will allow us to take water during the daytime hours from the Lake Water pipeline (at a low time of use.) We will then fill the tank during the day, and pump from it at night on a completely separate system from the golf course. Since the SVGTC is built on a six-inch sand cap soil material, this will allow us to irrigate lighter and more frequently, reducing the loss of water out of the bottom of the rootzone.
Advanced Turf Solutions and Corteva are excited to congratulate Augusta Lawn Care of Van Wert,…
There’s a phrase every golf course superintendent has heard at some point—usually from a well-meaning…
As the nation prepares for its 250th anniversary, two American institutions today announced a new…
After a record-breaking event in 2025, the Golf Course Superintendents Association of America’s (GCSAA) Rounds…
Coxreels® continues to lead industry innovation with the 1600 Series, a high-performance reeling platform designed…
Golf course superintendents in the Carolinas have committed $200,000 to help ensure the future of…